Proposal · 55 ft x 77 ft PEB Shed (Mono-Slope + Optional Rooftop Solar)
Client: BTI — Venus Pharma · Lahore, Pakistan · 2026-08-01
| ID | Risk | Severity | Mitigation |
|---|---|---|---|
| R1 | PE section not verified | Med | Hold steel PO until Kamran Ahmed/Rashid Mehmood sign-off |
| R2 | Option geometry ambiguity | Low | Corrected frame counts presented (10/12/20 col) |
| R3 | Steel price volatility | Med | PEB = 31.9% of cost; fix rate via PO within 90 days |
| R4 | Utility approval delay | Med | Liaise with SNGPL/WAPDA at mobilization |
| R5 | Monsoon earthworks | Low | Schedule footings outside Jul-Sep window |