Executive Summary
Fusion Developers proposes a purpose-designed mono-slope PEB package bringing the steel structure, building envelope, foundations and rooftop solar EPC scope under one accountable delivery team. The current package is supported by coordinated design drawings, fabrication information, BOQ and 3D review material.
Proposed Scope
- Approximately 8,660 kg of primary steel
- Ten main columns and two longitudinal rafters
- Z-purlins, cross bracing and sag bracing
- A572 Grade 50 steel and A325 structural bolts
- 0.5 mm PPGI roof and wall cladding
- 12 ft × 10 ft roll-up door opening
- RC foundations for ten columns and perimeter strip
- Epoxy/PU shop and site coating system
- 88 × Trina Vertex N 720 W PV modules
- 2 × 25 kW + 1 × 15 kW string inverters
- Solar BOS, earthing and lightning protection
- Coordinated design, drawings and handover package
Commercial Summary
| Scope | Amount (PKR) |
|---|---|
| PEB steel structure | 2,580,200 |
| Roof and wall cladding | 1,222,440 |
| Finishes / coating | 150,000 |
| Solar PV equipment — 63.4 kWp | 4,146,000 |
| Solar BOS / electrical | 835,500 |
| Earthwork / foundations | 700,000 |
| Preliminaries — labour and site | 488,800 |
| Subcontract total | 10,122,940 |
| Overhead & Profit @ 10% | 1,012,294 |
Total Contract Sum: PKR 11,135,234
Optional Enhancements
Next Steps
- Joint proposal and operational-requirements review.
- Freeze geometry, finishes, equipment basis and scope.
- Issue the formal quotation, milestones and baseline programme.
- Contract award, site handover and drawing release.
Initial proposal: Final taxes, payment milestones, programme, warranties, approvals, logistics and exclusions will be defined in the formal quotation and contract. Final engineering remains subject to verified site conditions and approved operational requirements.