FUSION DEVELOPERS

Proposal · 55 ft x 77 ft PEB Shed (Mono-Slope + Optional Rooftop Solar)

Client: BTI — Venus Pharma · Lahore, Pakistan · 2026-08-01

1. Executive Summary

Fusion Developers proposes a complete turnkey 55 ft × 77 ft Pre-Engineered Building (PEB) steel shed for BTI — Venus Pharma at Lahore, Pakistan, including columns, footings, brickwork and optional rooftop solar. Two schedules have already been issued to you (PEB: FD-INV-2026-001; Civil: FD-INV-2026-002). This proposal consolidates them, presents the three column/rafter options for today's meeting, and flags the mandatory engineering verification gate.

Commercial Position (per issued invoices)

PackageReferenceAmount
PEB Steel Shed — Option 2 (roof + glasswool + 4-side PPGI)FD-INV-2026-001PKR 5,724,000
Solar-Optimized Structure Add-on (optional)FD-INV-2026-001 supp.PKR 1,298,900
PEB Subtotal + 5% OHPKR 7,368,945
Columns, Footings & Brickwork (20 cols, 1584 sqft wall)FD-INV-2026-002PKR 2,199,371
GRAND TOTAL (PEB incl. optional solar + Civil)PKR 9,568,316
Engineering Hold (FD-QA-HLD-007): Per FD-QA-HLD-007 (IMRAN, FD-QA-001): column/rafter section sizes for all options are PRELIMINARY for visualization & BOQ only — NOT design-verified. Steel procurement/fabrication released only after PE sign-off (Kamran Ahmed FD-ENG-001 + Rashid Mehmood) confirming AISC 360-16 LRFD, wind 110 mph Exp C, seismic SDC C, rafter camber L/240, connections (25mm base plate, A325, 25mm J-bolts). This is a quality gate, not a scope gap.

2. Three Column / Rafter Options — Today's Meeting

OptionColumnsRafters (stated)Frames (corrected)Geometric Note
Option 11055 Client-stated 10 col / 5 rafter. Frames = cols/2 = 5. Bay spacing 77/5 = 15.4 ft.
Option 21236 Client-stated 12 col / 3 rafter — GEOMETRICALLY INCONSISTENT. Corrected: 6 frames = 12 cols / 6 rafter pairs. Bay spacing 77/6 = 12.83 ft.
Option 320510 Client-stated 20 col / 5 rafter — INCONSISTENT. Corrected: 10 frames = 20 cols / 10 rafter pairs. Bay spacing 77/10 = 7.7 ft.
Each frame = 2 eave columns + 1 rafter pair. Client-stated rafter counts for Options 2 & 3 are inconsistent with column counts; corrected frame counts shown above.

3. Scope of Work

4. Solar Option

63.4 kWp rooftop solar (~4.2 t) feasible on the PEB roof. Solar-optimized HR primary structure + up-rated purlins add Rs 295/sqft (quoted separately, optional).

5. Why Fusion

Premium architecture · engineering · construction · project development. 10-department execution council, Senior Architect verification gate on every deliverable, PK-standard materials (A572 Gr50 steel, 25mm base plates, A325 bolts, 25mm J-bolts).

PEBRCCMEPInteriorSolarQA/QC

6. Delivery & Next Steps

  1. Confirm column/rafter option from Section 2.
  2. Release PE sign-off (Kamran Ahmed + Rashid Mehmood).
  3. Issue fabrication PO + commence footings.
  4. 14-month programme (mobilisation → commissioning).
Fusion Developers (Pvt) Ltd · www.fusiondevelopers.pk · +92-332-2227426 · Issued 2026-08-01 · CONFIDENTIAL — for BTI — Venus Pharma only